Congo-Océan Railway Construction, 1921–1932

French Equatorial Africa

Écouter
Comparer
Voir dans la constellation

Traduction non disponible · Original (anglais) · français indisponible

Se connecter

The Congo-Océan railway was a major infrastructure project in French Equatorial Africa financed largely through metropolitan borrowing. Its construction depended on the compulsory recruitment of African men and imposed severe demographic and human costs. Between 1921 and 1932, 127,250 men were recruited, while the passage estimates that approximately 20,000 lives were lost before 1928.

Territoire · Route

Poursuivre l’exploration

Demander à Uriti

  • Que reliait la route Congo-Océan Railway Construction, 1921–1932 et pourquoi comptait-elle ?
  • Quel rôle joue Congo-Océan Railway Construction, 1921–1932 dans la région French Equatorial Africa ?
  • Quel lien entre Congo-Océan Railway Construction, 1921–1932 et Brazzaville ?
  • À propos de Congo-Océan Railway Construction, 1921–1932 : peux-tu préciser « Construction took place between 1921 and 1932. » ?

Le récit

A railway built through coercion

The Congo-Océan railway represented the central infrastructure ambition of French Equatorial Africa during the interwar period. Approximately 300 million gold francs were borrowed between 1920 and 1936 for the project, effectively absorbing nearly all the amounts legally authorized for railway-related borrowing. The railway linked colonial finance, metropolitan credit, transport infrastructure, and the extraction of African labour.

Construction depended on the recruitment of African workers on a massive scale. Between 1921 and 1932, 127,250 men were recruited, representing a combined absence of 138,125 years from their communities. The scale of recruitment illustrates how colonial infrastructure transferred the costs of development to African societies while presenting the resulting railway as an instrument of economic expansion.

The human consequences were catastrophic. The passage estimates that probably some 20,000 lives were lost before 1928. The railway therefore stands as a stark example of the coercive labour regime that accompanied colonial capital investment in French Equatorial Africa.

Repères

  • Construction took place between 1921 and 1932.
  • Approximately 127,250 men were recruited.
  • Borrowing financed most of the railway project.
  • The passage estimates about 20,000 deaths.
  • The railway exemplified coercive colonial development.

Confiance

élevée

Ce niveau qualifie la précision des dates, localisations et limites disponibles dans le corpus actuel.

Source

General history of Africa, VII: Africa under colonial domination, 1880-1935

Point de départ pour aller plus loin — pas une bibliographie exhaustive.

RessourcesCarte
RouteConfiance élevée

XXᵉ siècle – XXᵉ siècle

Congo-Océan Railway Construction, 1921–1932

French Equatorial Africa

Écouter
Comparer
Voir dans la constellation

Traduction non disponible · Original (anglais) · français indisponible

Se connecter

The Congo-Océan railway was a major infrastructure project in French Equatorial Africa financed largely through metropolitan borrowing. Its construction depended on the compulsory recruitment of African men and imposed severe demographic and human costs. Between 1921 and 1932, 127,250 men were recruited, while the passage estimates that approximately 20,000 lives were lost before 1928.

Territoire · Route

Poursuivre l’exploration

Demander à Uriti

  • Que reliait la route Congo-Océan Railway Construction, 1921–1932 et pourquoi comptait-elle ?
  • Quel rôle joue Congo-Océan Railway Construction, 1921–1932 dans la région French Equatorial Africa ?
  • Quel lien entre Congo-Océan Railway Construction, 1921–1932 et Brazzaville ?
  • À propos de Congo-Océan Railway Construction, 1921–1932 : peux-tu préciser « Construction took place between 1921 and 1932. » ?

Le récit

A railway built through coercion

The Congo-Océan railway represented the central infrastructure ambition of French Equatorial Africa during the interwar period. Approximately 300 million gold francs were borrowed between 1920 and 1936 for the project, effectively absorbing nearly all the amounts legally authorized for railway-related borrowing. The railway linked colonial finance, metropolitan credit, transport infrastructure, and the extraction of African labour.

Construction depended on the recruitment of African workers on a massive scale. Between 1921 and 1932, 127,250 men were recruited, representing a combined absence of 138,125 years from their communities. The scale of recruitment illustrates how colonial infrastructure transferred the costs of development to African societies while presenting the resulting railway as an instrument of economic expansion.

The human consequences were catastrophic. The passage estimates that probably some 20,000 lives were lost before 1928. The railway therefore stands as a stark example of the coercive labour regime that accompanied colonial capital investment in French Equatorial Africa.

Repères

  • Construction took place between 1921 and 1932.
  • Approximately 127,250 men were recruited.
  • Borrowing financed most of the railway project.
  • The passage estimates about 20,000 deaths.
  • The railway exemplified coercive colonial development.

Confiance

élevée

Ce niveau qualifie la précision des dates, localisations et limites disponibles dans le corpus actuel.

Source

General history of Africa, VII: Africa under colonial domination, 1880-1935

Point de départ pour aller plus loin — pas une bibliographie exhaustive.

Continuer le voyage

Chemins liés

D’autres chemins liés à cette histoire.

  • Colonial Economy of the Former French, Belgian, and Portuguese Zones, 1914–1935Événement·XXᵉ siècle — XXᵉ siècle
  • French Equatorial Africa, 1914–1935Royaume·XXᵉ siècle — XXᵉ siècle