RessourcesCarte
ÉvénementConfiance élevée

XXIᵉ siècle

Merowe Dam

Northern Sudan, Nile River

Écouter
Comparer
Voir dans la constellation

Traduction non disponible · Original (anglais) · français indisponible

Se connecter

Merowe Dam is a large multipurpose hydroelectric project constructed on the Nile in northern Sudan with substantial Chinese assistance. Completed and inaugurated in 2009, it was designed to expand electricity generation, improve domestic water supplies, and support irrigation. Its reservoir extends far upstream, while construction displaced approximately 6,000 farmers, making the project both a major infrastructure investment and a source of social disruption.

Territoire · Événement

Poursuivre l’exploration

Demander à Uriti

  • Que s’est-il joué lors de Merowe Dam ?
  • Que sait-on de Merowe Dam à partir de 2 009 ?
  • Quel lien entre Merowe Dam et China ?
  • À propos de Merowe Dam : peux-tu préciser « Completed and inaugurated in 2009 » ?

Le récit

A major Nile infrastructure project

Merowe Dam was constructed on the Nile River approximately 350 kilometers north of Khartoum. The project received about $1.8 billion in assistance, most of it from China, and became one of Sudan’s most ambitious development ventures during the first decade of the twenty-first century. Its scale reflected the government’s effort to expand infrastructure and harness the Nile for national economic development.

The dam was designed as a multipurpose installation. Its generating capacity was stated as 1,250 megawatts, while the reservoir was expected to extend nearly 177 kilometers upstream and hold about one-fifth of the Nile’s annual flow. The project was intended to increase Sudan’s electricity supply, improve domestic water provision for millions of people, and provide water for crop irrigation.

Document source · p.94 · pdf · Source document

President Omar al-Bashir inaugurated the completed dam in 2009 and described it as a project of the century and a source of pride for Sudan, the Arab world, and the wider world. The project nevertheless carried significant human costs: approximately 6,000 farmers were displaced by the reservoir and associated construction. Merowe therefore illustrates the tension between large-scale infrastructure development and the protection of rural communities.

Repères

  • Completed and inaugurated in 2009
  • Built on the Nile north of Khartoum
  • Designed to generate 1,250 megawatts
  • Supported by approximately $1.8 billion
  • Displaced about 6,000 farmers

Confiance

élevée

Ce niveau qualifie la précision des dates, localisations et limites disponibles dans le corpus actuel.

Source

Sudan (Modern World Nations)

Point de départ pour aller plus loin — pas une bibliographie exhaustive.

RessourcesCarte
ÉvénementConfiance élevée

XXIᵉ siècle

Merowe Dam

Northern Sudan, Nile River

Écouter
Comparer
Voir dans la constellation

Traduction non disponible · Original (anglais) · français indisponible

Se connecter

Merowe Dam is a large multipurpose hydroelectric project constructed on the Nile in northern Sudan with substantial Chinese assistance. Completed and inaugurated in 2009, it was designed to expand electricity generation, improve domestic water supplies, and support irrigation. Its reservoir extends far upstream, while construction displaced approximately 6,000 farmers, making the project both a major infrastructure investment and a source of social disruption.

Territoire · Événement

Poursuivre l’exploration

Demander à Uriti

  • Que s’est-il joué lors de Merowe Dam ?
  • Que sait-on de Merowe Dam à partir de 2 009 ?
  • Quel lien entre Merowe Dam et China ?
  • À propos de Merowe Dam : peux-tu préciser « Completed and inaugurated in 2009 » ?

Le récit

A major Nile infrastructure project

Merowe Dam was constructed on the Nile River approximately 350 kilometers north of Khartoum. The project received about $1.8 billion in assistance, most of it from China, and became one of Sudan’s most ambitious development ventures during the first decade of the twenty-first century. Its scale reflected the government’s effort to expand infrastructure and harness the Nile for national economic development.

The dam was designed as a multipurpose installation. Its generating capacity was stated as 1,250 megawatts, while the reservoir was expected to extend nearly 177 kilometers upstream and hold about one-fifth of the Nile’s annual flow. The project was intended to increase Sudan’s electricity supply, improve domestic water provision for millions of people, and provide water for crop irrigation.

Document source · p.94 · pdf · Source document

President Omar al-Bashir inaugurated the completed dam in 2009 and described it as a project of the century and a source of pride for Sudan, the Arab world, and the wider world. The project nevertheless carried significant human costs: approximately 6,000 farmers were displaced by the reservoir and associated construction. Merowe therefore illustrates the tension between large-scale infrastructure development and the protection of rural communities.

Repères

  • Completed and inaugurated in 2009
  • Built on the Nile north of Khartoum
  • Designed to generate 1,250 megawatts
  • Supported by approximately $1.8 billion
  • Displaced about 6,000 farmers

Confiance

élevée

Ce niveau qualifie la précision des dates, localisations et limites disponibles dans le corpus actuel.

Source

Sudan (Modern World Nations)

Point de départ pour aller plus loin — pas une bibliographie exhaustive.

Continuer le voyage

Chemins liés

D’autres chemins liés à cette histoire.

  • KhartoumVille·XIXᵉ siècle — XXIᵉ siècle